Saudi Quarries Just Became a Listed Business — and Uptime, Not Reserve, Is What Gets Measured
Short answer: In February 2026 a Saudi quarry operator became the first company to list on the Saudi Exchange that year, and its prospectus put hard numbers on something the industry usually keeps private: capacity per quarry versus actual production per quarry. Across five producing quarries, 2024 output was about 12.1 million tonnes against roughly 16.9 million tonnes of installed capacity — a utilisation rate near 72 percent. The reserves were never the constraint. The gap between what a plant is rated to make and what it actually makes is a plant availability question, and in a crushing circuit the availability of the conveying system is usually where it is decided.
What the Prospectus Actually Disclosed
Saleh Abdulaziz Al Rashed & Sons listed 30 percent of its shares on the Main Market of the Saudi Exchange in February 2026, raising capital at SAR 45 per share after an institutional book that was reported as 67.7 times covered. The company operates seven quarry sites with 13 crushers and four asphalt mixing plants, supported by a fleet of roughly 563 trucks and about 700 units of heavy machinery.
For anyone who runs a quarry, the interesting part is not the valuation. It is that a listed company has to publish its capacity and its production, quarry by quarry, in the same table.
The capacity numbers, quarry by quarry
The prospectus data, as reported, sets out current capacity, 2024 capacity and 2024 actual production for each long-term quarry:
Two of those quarries ran at 82 and 89 percent of capacity in 2024. Three ran well below. That distribution is the most useful piece of information in the document, because it shows that utilisation is not a single company-wide number — it is a per-plant number, and it varies enormously between sites running the same commodity with the same equipment philosophy.
Why the low utilisation figures are not all the same story
A 6.7 percent utilisation rate is not a belt problem. It is usually a site that is new, ramping, or constrained by permits, market access or mobile plant deployment rather than by mechanical availability. Reading that figure as an equipment failure would be wrong, and no operator should benchmark against it.
The figures worth studying are the middle ones. A quarry at 57 percent, or at 36 percent, on installed capacity is a quarry where something in the chain is not keeping up reliably — and in a crushing circuit, the first question is not how big the crusher is. It is how often the plant actually ran.
Nameplate Capacity Is a Crusher Number, Not a Plant Number
Equipment suppliers quote crusher capacity in tonnes per hour under stated conditions: a given feed size, a given bulk density, a given crusher setting, and a given proportion of fines in the feed. Those conditions describe a crusher, not a plant.
The plant is a chain. Run-of-mine rock goes over a primary feeder, through a primary crusher, onto a discharge conveyor, over a screen, into a secondary or tertiary crusher, back onto conveyors, and out to stockpiles. Every link in that chain has a rated capacity, and the plant's capacity is the lowest one — but the plant's output is set by something else again: the fraction of scheduled time during which the whole chain is running.
The circuit is a chain, and the belt is the weakest link
There is a consistent pattern in aggregate plants. The crusher is specified with margin, because crusher capacity is the number on the quotation and it is the number the buyer scrutinises. The screens are specified with margin for the same reason. The conveyors underneath are often sized tightly — to the nominal tonnage, sometimes to the crusher's rated output rather than its peak, and sometimes with a belt width chosen from a table rather than from the actual lump size and tonnage.
The consequence appears over months rather than at commissioning. The belt is the component with the least margin and the most continuous duty, so it is the component that sets sustained output. A crusher can be relied on to deliver its rated tonnage when it is fed. A conveyor belt has to do it for twenty hours a day, in dust, in heat, with a cover that is wearing thinner.
Cover wear quietly reduces capacity
A conveyor belt's ability to carry material depends on its cross-sectional profile, and the profile depends on the cover and the carcass retaining their shape across the troughing idlers. As the top cover wears, the belt's troughability changes slightly, the material sits differently, and spillage at the load point increases.
None of that shows up as a failure. It shows up as a plant that used to make its number and now makes slightly less, with more housekeeping and more clean-up labour. Operators often respond by reducing feed rate to stop the spillage — which is precisely the wrong trade, because it converts a belt problem into a throughput problem and then into a cost-per-tonne problem.
Where Quarries Lose Tonnes
Three specific places account for most of the gap between rated and actual output.
Surge piles that stop the primary
A primary crushing station that discharges onto a stockpile and is then reloaded by wheel loader has a hidden cost: when the loader is not there, or the stockpile is full, the primary stops. A primary that stops and starts repeatedly loses far more than the idle time, because each stop interrupts the feed, disturbs the crusher's choke condition, and puts a shock load through the discharge belt when it restarts.
The fix is a surge arrangement designed for the actual haul cycle — either a live-capacity bin or a stockpile with a reclaim conveyor, sized so that the primary can run continuously through a loader change or a truck cycle gap.
Double handling at the stockpile
Every tonne that is stockpiled by a conveyor and then reloaded by a wheel loader is handled twice, and the second handling is the expensive one. It also degrades the product: segregation at the stockpile face, compaction under the loader, and contamination from the ground.
Radial stackers and properly designed stockpile conveyors do not remove the need for stockpiling. They remove the second handling for the fraction that goes out by truck directly, which is often the majority of a quarry's dispatch.
Chute and transfer bottlenecks
Transfer points are where plants plug. A chute designed on a drawing for a nominal gradation will hang when the feed gets wet, when the fines proportion rises, or when a screen deck changes and the product mix shifts. Every hang is a stop, and every stop is a restart with a full belt.
Wide transfer openings, steep chute angles, wear liners that do not create ledges, and access for clearing without dismantling are not refinements. On a plant that runs continuously they are the difference between a circuit that holds its rated rate and one that does not.
The Cost of a Stop
Quarry operators know their cost per tonne. Fewer know their cost per stopped hour, and the second number is what makes a conveyor belt decision look different.
The arithmetic is simple and can be done with the plant's own figures. Take a circuit rated at a throughput you know it actually achieves, not its nameplate. Multiply by the contribution margin per tonne — the difference between selling price and variable cost, not the selling price. That gives the cost of one lost production hour.
As a worked illustration only, with hypothetical figures: a circuit sustaining 500 tonnes per hour with a contribution margin of SAR 12 per tonne loses SAR 6,000 of contribution for every hour it does not run. A belt that fails twice a year for a day each time, on a twenty-hour operating day, is 40 hours — SAR 240,000 of contribution, before the belt itself, the labour, the crane, and the trucking cost of failing to supply a customer.
Two conclusions follow. First, the economic case for a better belt specification is usually made on availability, not on belt price. Second, the case for keeping a critical spare on site is made on the same arithmetic — a spare that costs a fraction of one lost day pays for itself the first time it is used.
Belt Specification for Aggregate Duty
Aggregate duty is not one duty. It varies with rock type, with position in the circuit, and with the product being made.
Basalt and granite versus limestone
Rock type matters more than most procurement documents acknowledge. Crushed basalt and granite are hard and sharp; they abrade a cover quickly and they cut a carcass when a sharp edge lands on a belt at a transfer point. Limestone is softer and more forgiving, but it produces more fines, and fines are what adhere to a belt and build up on idlers when there is any moisture.
A single "heavy duty" conveyor belt specification applied across both rock types will be over-specified in impact resistance where it is not needed and under-specified in abrasion resistance where it is. Specifying by duty point costs no more in total and delivers more life where it matters.
Cover grade and carcass choice
Cover compounds are classified by their resistance to abrasion and to cutting and gouging, and the classification system exists precisely so that a buyer can match compound to duty rather than accept a generic grade. For high-abrasion aggregate duty, the abrasion-resistant class is the starting point; for primary discharge with large sharp lumps, cut-and-gouge resistance and impact resistance matter alongside it.
Carcass choice follows from the duty. Textile carcass suits most aggregate conveyors where flexibility and troughing matter; steel cord becomes relevant when the duty is long, the tonnage is high, and the belt must sustain tension over distance. The relevant construction standards are the ISO series for textile and steel cord belting, and a specification that does not name them is a specification that cannot be checked on delivery.
What to Measure Before You Buy Capacity
Six numbers, in the order they should be established.
One — achieved hourly rate, not nameplate. Measure tonnes per operating hour over a full shift, with a belt scale or by weighing dispatch. Nameplate is the supplier's number; achieved rate is yours.
Two — mechanical availability separately from utilisation. A plant can be 95 percent mechanically available and 60 percent utilised because the market, the permits or the trucks are the constraint. Confusing the two leads to buying equipment that will not be used.
Three — the binding constraint in the chain. Identify it by measurement, not by reputation. It is often not the crusher.
Four — stop frequency and duration by cause. Count stops, not downtime hours. Twenty two-minute stops and one forty-minute stop require completely different fixes.
Five — belt cover remaining thickness on the critical belts. Cover wear is measurable and predictable, and it turns a surprise failure into a planned replacement.
Six — spillage and carryback volume per shift. Clean-up labour is a throughput cost disguised as a housekeeping cost, and on a quarry belt it is also the clearest early signal that cover wear has changed the belt's profile.
How BEDROCK Supports Quarry Uptime
BEDROCK is a conveyor system solutions provider based in Dammam, Saudi Arabia, backed by a 16-year engineering and manufacturing base in Ningbo operating as KILOMEGA. Quarry and crusher operations are among our core customers across the Kingdom, alongside cement, concrete batching, building-material, chemical and steel plants.
Aggregate conveying as core business. Primary discharge, screen feed, product and reclaim conveyor belts in crushing circuits are the duty our engineers specify daily, and our application experience covers the abrasive and high-impact bulk material handling conditions a quarry in Saudi Arabia actually runs in.
Specification by duty point. We specify cover compound and carcass against the rock type and the position in the circuit, rather than applying one grade across a plant. Basalt and limestone do not wear a belt the same way, and a specification that treats them identically is leaving life on the table at one end and money at the other.
Splicing quality. Our engineers carry out hot vulcanized jointing on site with a target splice efficiency above 90 percent. In a crushing circuit a hot vulcanized splice is not a maintenance item — it is the point where a belt most often fails, and it fails at the worst time, under load, at the head end.
Local stock and defined response. Local spare-parts stock in Saudi Arabia for critical components, remote technical support within 24 hours, and a defined on-site response path for downtime. For a quarry running a single circuit, the spare on the shelf is the difference between a planned stop and a lost week — and in a bulk material handling plant with no bypass, that difference is measured in tonnes, not hours.
Our range covers industrial conveyor belts for abrasive, hot, wet and high-impact duty, supported by technical services from selection through installation and performance tracking.
Trying to close a capacity gap? Send us the rock type, the duty point, the achieved tonnes per hour and the belt width you are running — and our engineers will tell you whether the belt is the constraint or whether the money is better spent elsewhere.
Contact BEDROCK WhatsApp: +966 56 171 7029 · Email: [email protected] · Website: www.bedrockco.sa · Salman Farisi St., Khalidiyah Al-Janubiyah, Dammam, Saudi Arabia
📱 WhatsApp:+966 56 171 7029
✉️ 邮箱: [email protected]
🌐 网站: www.bedrockco.sa